Environmental Impact Assessment Cell

 

This cell is coordinated and facilitated all the activities concerning the environmental impact assessment (EIA) and preparation of environmental management plans (EMPs) for river valley, mining and other developmental projects as and when this task is assigned to the institute by the project proponents for getting environmental clearance (E.C.) under the Environmental Protection Act, 1986 in accordance with the directions issued under the EIA notification of the Ministry of Environment, Forest & Climate Change (MoEFCC), Govt. of India, in force at that time. The cell is responsible for discharging the following functions:

  1. To take all necessary steps for obtaining the accreditation to the institute to conduct EIA from the National Accreditation Board for Education and Training (NABET) under the Quality Council of India (QCI)

  2. To take all necessary steps for obtaining accreditation to the institute laboratories from the National Accreditation Board  for Testing and Calibration Laboratories (NABL) under the QCI

  3. To take timely action for periodic renewal of the above-mentioned accreditations.

  4. To actively contact with various potential project proponent agencies and also take necessary action for participation in the tendering process, if required, for obtaining the consultancies for EIA/EMP

  5. To assign the tasks of conducting discipline-specific field investigations required for EIA and preparation of respective chapters of the EMPs to available accredited domain experts.

  6. To outsource this task to accredited outside experts in case of those disciplines for which in-house accredited experts are not available.

  7. To coordinate with and facilitate the appointed experts (in house or outside) and monitor the progress of their work.

  8. To ensure timely submission and presentation of EIA reports/EMPs to the project proponents/State Expert Appraisal Committee (SEAC) or the District Expert Appraisal Committees (DEACs), as the case may be.

  9. To participate in public hearing meetings organized by the Central or  State Pollution Control Boards and make presentation about the EIA/EMP in these meetings.

  10. To take all required steps for obtaining ECs from the State Environmental Impact Assessment Authority (SEIAA) or MoEFCC as the case may be.

 

Institutional Staff

Name Dr. Jyoti Singh                                                                                            
Designation Senior Research Officer  and Cell In-charge                                        
Qualification M.Sc. (Botany), M.Phil. (Botany), Ph.D. (Botany)
Experiance 33 years
Email  This email address is being protected from spambots. You need JavaScript enabled to view it.
Contact No. 9424305561

 

Name Vijay Kumar Haldkar                                                                                                   
Designation Dy. Ranger                                                  
Qualification M.Com.
Experiance 37 years
Email  This email address is being protected from spambots. You need JavaScript enabled to view it.
Contact No. 709479466120                                                                                     

 

RESEARCH

On-going Projects

Title of the Project

Name of PI

Co-PI

Source of funding

Sanctioned amount (Rs.)

Date of initiation

Due date of completion

Prepatation of phytosociological study of main species in and around upto 5 km the manganese bearing area at Balaghat, M.P. Dr. Jyoti Singh  Rakesh Jain & Vijay Haldkar MOIL Limited Balaghar, M.P.  Rs 9,98,188  Aug 2024 Jan. 2025 
Baseline data genration work of flora fauna studies for preparation of EIA/EMP report for the three open cast coal mining projects of M/s Northern Coalfields Limited Singrauli M.P. Dr. Jyoti Singh & Dr Aniruddha Majumder Vijay Haldkar CMPDIL Singrauli Rs. 8,30,560 Aug 2024 Jan. 2025

 

Completed  Projects

Title of the Project

Name of PI

Objectives

Funding Agency   

Year of Completion

Environmental Impact Assessment on Flora, Fauna & Socio-economic status of local communities and action to be taken to mitigate impact of Kopra Medium Project at Nauradehi Wildlife Sanctuary, Sagar District (M.P)

  Dr. Jyoti Singh,

Dr. Aniruddha Majumdar,

Dr Uday Homkar

  • To suggest mitigation measures for conservation/protection and improvement of flora, fauna, habitats and social status of local communities.
  • To assess the probable impacts of the proposed activities on flora, fauna of the area and their habitat within the 10 km impact zone.
  • To assess the impact of noise, air and water quality due to proposed activities.

Water Resources Department, Sagar, M.P.

2023

Assessment of impact of Doubling of Katni Singrauli Railline Project on flora, fauna and habitats of Sanjay-Dubri Tiger Reserve (M.P.)

 

  Dr. Jyoti Singh,

Dr. Aniruddha Majumdar,

Dr Uday Homkar

  • To collect the baseline data on existing flora and fauna and the socio-economicstatusof theareaforthebiodiversity report.
  • To assess the probable impacts of the proposed activities on flora and fauna of thearea andtheirhabitat within the10km impact zone.
  • To assess the impact of noise, air and water quality due to proposed activities,
  • To suggest mitigation measures and animal passage plan for conservation /protection and improvement of flora, fauna, habitats and social status of localcommunities.
IRCON International Limited, Katni March 2023

 

 

 

 

 

 

 

 

 

 

List of Equipments in the EIA Lab

S.No.

Equipment Name    

Testing Parameter

Water Equipments

1

Do meter

Dissolved oxygen

2

BOD System

Biological oxygen demand

3

BOD incubator

For Bod determination

4

COD Analyzer

Chemical oxygen demand

5

Distillation unit

Distilled water

6

pH meter

pH

7

Multiparameter photometer (HI 83200)

Alkalinity, Amonia, Bromine, Total Chlorine, Fluoride, Aluminium, Free chlorine, Calcium, Chromium, Copper, Cynuric acid, Iodine, Chlorine dioxide, Calcium hardnes, Iron, Magnesium, Manganese, Nickle, Ozone, pH, Nitrite, Phosphate, Phosphorus, Potassium, Sulphate, Silica, Zinc, Colour of water, Molybednum, Nitrite Dissolved oxygen.

8

Electrical conductivity meter

Electrical conductivity

9

EC, TDS, NaCl, Resistivity, Temperature Meter (HI 98192)

EC, TDS, NaCl, Resistivity, Temperature Meter

10

Turbidity Meter (HI 93102)

Turbidity

Air Equipments

11

Gas Sampler

Carbon monoxide, sulfur dioxide, and nitrogen dioxide

12

Aerocet 830

Particulate matter (PM10, PM2.5, PM4, PM1)

Noise Equipment

13

SLM 100

Sound quality

Other Equipments

14

Hygrometer

Light intensity measurement

15

Thermometer

Room Temperature

 

16

Electronic balance

Weighing

 

 

SERVICES RENDERED

The Institute also renders services fee based on air, water and noise pollution assessment with indoor as well as outdoor lab facilities. EIA laboratories is well equipped with advance equipments and provide physical and chemical analysis of air, water and noise quality analysis.

Charges of Water Analysis, Air and Noise Monitoring of EIA Laboratory (Download pdf)

 

Contact:
Dr. Jyoti Singh  
EIA Cell In-charge
State Forest Research Institute
Polipathar, Jabalpur, Madhya Pradesh  - 482008
Tel: +91-761-2665540
e-mail: 
This email address is being protected from spambots. You need JavaScript enabled to view it.